Marcy Gulch Channel Stabilization
Highlands Ranch Metro District, Colorado
The banks of the Marcy Gulch drainage channel were experiencing significant erosion, threatening nearby housing developments. MaxFour provided geotechnical investigation, soil-cement mix designs, and construction observation for the installation of 20 soil-cement drop structures. These economical and eco-friendly structures have curbed erosion and improved water quality.