Kuiper Zone 4 Pump Station
City of Aurora, Colorado
MaxFour performed the architectural design, structural design, and corresponding construction services for a 30 MGD water pump station. This design-build project was scheduled for fast-track construction, so we worked closely with the contractor to complete the architectural/structural construction three months ahead of schedule.